Bid Number: RFQu 320096
Bid Title: RFQu 320096 - Greenway Rd; Cotton Ln to Sarival Ave CM@R
Category: Construction Opportunities
Status: Closed

Description:

In 2007 the city conducted an arterial capacity study that identified all of the major arterial roadways throughout the city that are not currently built to their ultimate condition. The goals of the Arterial Capacity Study are rooted in traffic safety and traffic congestion mitigation. Greenway Road between Cotton Lane and Sarival Avenue was identified within this study as being incomplete.

The Greenway Road alignment between Cotton Lane and Sarival Avenue is narrowed due to the underdeveloped area along Greenway Road. This project will finish the south half of Greenway Rd from 800 feet west of the State Route Loop 303 (SR303) and 1600 feet east of the SR303. The single lanes along the south side of Greenway Road are over capacity with over 21,000 vehicles per day. As the City of Surprise continues to grow and develop, these unimproved sections of Greenway Road will continue to be over saturated causing a rise in traffic congestion and safety issues. This project will eliminate areas that have multiple lanes merging into one lane in each direction. These improvements will provide matched lane configurations on Greenway Road in and around the SR Loop 303/ Greenway Road interchange to accommodate the anticipated traffic volume, improve traffic flow and reduce congestion along Greenway Road. The completion of this roadway segment will also provide relief to the eastern and western city ingress and egress points; with a goal of improving commute times, mitigating congestion and improving air quality. Completion of this roadway should also relieve traffic from other east/west arterial roadways.

The specific improvements within this segment of Greenway Road will include two additional travel lanes (for a total of four), provisions for drainage, sidewalks, bicycle lane, street lighting, landscaping, and turn lanes. This project will also include the relocation of existing Maricopa Water District infrastructure.


Publication Date/Time:
10/31/2019 12:01 AM
Publication Information:
AZ Business Gazette 10/31/18 & 11/7/2019; COS Website
Closing Date/Time:
12/12/2019 11:00 AM
Submittal Information:
Sealed envelope; Bid number and Offeror's name and address clearly indicated on front
Bid Opening Information:
12/12/2019; Immediate Follow
Pre-bid Meeting:
11/14/2019 1:00 PM
Contact Person:
Yvonne Perez, CPP
Sr. Buyer, City of Surprise
purchasing@surpriseaz.gov
Plan Holders List:
In order to view the related documents, you will be required to provide your contact information. This information will be used to create the Plan Holders List for this solicitation. The Plan Holders list is a public document.
Special Requirements:
The City of Surprise strongly recommends that all interested respondents to this Construction Manager-at-Risk Request for Statement of Qualifications attend a OPTIONAL pre-submittal conference will be held on Thursday, November 14th, 2019 at 1:00 PM, (Local Time) at the City of Surprise Community Room, 16000 N. Civic Center Plaza, Surprise, Arizona 85374. Attendance at this meeting is highly recommended since vital information necessary to the understanding of the Project and the selection process will be discussed.